Call for Deployment Site


 

We are looking for a site to deploy
& test Neptune 4 in 2016.     

 

Contact Us or call Charles at 604-626-5901 if interested or for more information.

 

The site should be on the west coast of Vancouver Island in the Sooke - Jordan River - and beyond, area.  

 

  It needs to be accessile by vehicle, have a steep bank waterfront and have metered BC Hydro electric power on the site (for net metering).

 

This is your opportuniy to become involved in a major event in the establishment of renewable "clean" electrical energy generation.

 

We will cover all costs including permits &  complete removal of the unit when the deployment period is completed after 1 to 5 years.

 

The site owner can keep all earnings from the electricity purchased by BC Hydro under their net metering program.

Area of interest for Neptune 4 deployment in 2016
Neptune 4 will look similiar to Neptune 3 (above) with the upper framework & dome replaced with a much smaller structure

2010+     2015           2016+        Comparisons