Neptune 4 Fabrication

Neptune 4 has a primary emphasis on storm survivability. 

 

One of our goals is to survive at least 6 "Gale Force" storms and be fully operating as soon as each storm has passed.


see
Call for West Coast Deploymet Site

 


 

A secondary emphasis is on testing the improved WEC system of Neptune 4 which is designed:

 

     a.  for the new, larger wave profiles expected at the    
          deployment location on the west coast of
          Vancouver Island, and,

 

      b.  with respect to the energy extraction optimizing
            lessons
learned from the testing and experiments
            made with Neptune 3
.

 